Home Links Contents Contact Search Company
| |
|
21CFR Part 11 (Software, computer, and
electronic signatures)
Programming / Debugging
- Debugging and Programming
Used VBA to modify, debug and augment an existing Access based dBase for
storage of equipment, calibration, inventory, deliverables, material tree,
inspections, label making, report making and documentation system
tracking.
Validations – Black Box testing /
validations only
- IQ/OQ/PQ validation protocol
writing, execution and report
- Blue Mountain (Equipment /
Calibration Tracking software) execution and report
- AssurX | CatsWEB (custom
designed SQL based audit and CAPA (corrective action and preventive
action) tracking program)
- Revision of protocol per
Part 11 requirements, Validation Plan, inclusion of functional
requirements, creation of IQ/OQ/PQ sections, deleted redundancy and
included acceptance criteria.
- Execution of validation
remotely on Target’s (subsidiary of Boston Scientific) server.
- MS Access based documentation
system protocol writing and execution.
- Vendors & Parts (low end MRP system) writing of validation plan, and
IQ/OQ/PQ.
- MFG-Pro ERP system report
modules.
- SolidWorks Viewer
- Excel Templates
- LabView laser system
- Backup/Archive System
V&V (validation and verification)
- Worked with CSS in developing
FMEA, FTA, HA, Design Specifications, and validation plan for Immunoassay
electronic custom software driven medical device.
Typical Protocol Development
- Validation Protocol – Validation
Plan (Master Plan), IQ/OQ/PQ
- Approval
- Introduction
- Ownership / responsibility
- Overview
- Discrepancy / Deviation Log
and Report
- Signature Log
- References
- Prerequisite Documentation
- Test Equipment Log
- Test Cases
- Objective
- System Prerequisite
- Input Specifications
- Output Specifications
- Special Procedureal
Requirements
- Test Procedure
- Contents of Tables /
Attachments for execution
- Procedural Steps
- Expected Results
- Actual Results
- Pass / Fail
- Initial Date at end of
each page
- Comments
- Test Conclusion
- Tester’s Signature
- Verification Signature
- Installation Qualification
- Hardware testing
- Access space
- Power supply / UPS
- Network communications
- Interconnecting wiring /
cabling
- Ambient Temp / Rh
- Peripheral systems
connections
- Software testing
- OS / Network and
communication software
- OEM software and custom
software
- Virus checking & Firewall
- Verification of drive &
RAM space
- Drive configuration
- Software version numbers
- Security access for
installation and operation
- Directory configuration
- Path modification
- System Parameter
configuration
- Operation Qualification
- Testing of specified range
of inputs for a data field tested at each end of the range
- Testing if illogical inputs
are accepted
- Performance Qualification (not
always needed)
- Executed on complex systems
with multiple inputs and outputs as well as network-based systems
during times of high user input and high data throughput.
|
|